Target Objective • Problem Brief Directive
Metal Production Velocity per Person
Dynamic Short Interval Control eliminates face starvation and turnaround bottlenecks to lift output from baseline 51 T/person/yr to target 60 T/person/yr.
Current Run-Rate
58.6
T METAL / PERSON / YEAR
Target Velocity
60.0
+17.6% TRAJECTORY
Physical Avail.
88.5%
Target: +5%
Fleet Util.
78.2%
Target: +15%
Face Util.
81.4%
Target: +15%
LHD Prod.
5.8 hrs
Target: +15%
Truck Prod.
6.1 hrs
Target: +15%
Dev Advance
96.5%
Target: >95%
Idle Reduction
-22.6%
Target: -20%
ARJUNA PRESCRIPTIVE RECOVERY INTERVENTIONS
Constrained Hungarian/MILP Optimization • Human Authorization Mandated
Dynamic Plan vs. Actual Production Trajectory
15-Minute Short Interval Cumulative Ore Haulage (Tonnes)
Planned: 740 T
Actual: 655 T
Escalation Protocol
Auto-TriggerTiered notifications mapped to delay severity.
Underground Face State Machine
Drill → Blast → Clear → Muck → Bolt Cycle Monitor
| Face ID | Level | Current Cycle Stage | Progress | Stockpile | Grade | Condition |
|---|
Loss Diagnostics
SIC Latency EngineProductivity penalties itemized by root-cause.
Underground Telemetry Stream
100 Hz Ingestion
> [13:37:10] LHD-01 bucket payload: 14.2 T at -380 mRL
> [13:37:14] TRK-01 weighbridge scan: 50.4 T net ore
> [13:37:19] JMB-01 drill round 14/48 complete (Face 420-N)